๐ SPECFINDER โ CONSTRUCTION SPECIFICATION ANALYST
The requirement map for the divisions you didn’t have time to read.
SpecFinder hands back everything the spec book requires, organized by trade division, every finding carrying its section and page number โ so it verifies against the source document in seconds. With it come the populated submittal log and the exclusion checklist with the exact spec language behind each scope qualification.
The package travels with the project โ from the estimator who bid it to the engineer who runs the submittals to the manager who defends the scope.
Every finding verifiable in under 30 seconds
SECTION 07 84 00 ยถ3.2
FLAGGED
Firestopping responsibility assigned to the penetrating trade. Your exclusion may not hold.p. 247
SECTION 01 78 46
FOUND
Commissioning authority submittal required from every mechanical trade. Not in Division 23 โ this is a Division 01 requirement that applies to your scope.p. 112
SECTION 23 05 53 โ DIV 26
COULD NOT DETERMINE
Cross-reference unresolved โ Division 26 does not mention VFDs in this spec book. Check with the GC or issue an RFI.p. 156 p. 298
actual output format โ finding, citation, page