SubmittalTracker
Submittal delays kill schedules. SubmittalTracker monitors review cycles across all trades, predicts schedule crashes before they happen, and sends automated nudges when bottlenecks form.
Upload your project submittal schedule—from specs, contract documents, or your own tracking sheet—and the system creates a centralized dashboard showing what’s required, who’s responsible, current status, and upcoming deadlines. It tracks submittals from initial submission through architect review, revisions, and final approval. The tool flags which submittals are on the critical path for procurement or installation, cross-references requirements against your project schedule, and triggers next procurement steps the second approvals hit.
How to try SubmittalTracker
1. Click one of the prompts to copy it to your clipboard
Critical Path Long-Lead Item
👆 Click to copy full prompt
Overdue Submittal Bottleneck
👆 Click to copy full prompt
Submittal Approval Before Fabrication
👆 Click to copy full prompt
2. Click this button to open SubmittalTracker in a new tab
3. Paste your prompt, and run it
Submittal Status Dashboard
SUBMITTAL STATUS DASHBOARD
Project: Gateway Corporate Plaza – Office Tower Renovation
Project Manager: Sarah Martinez
Report Generated: November 10, 2025
Project Week: Week 14 of 40
Generated by: SubmittalSentinel 1.0
EXECUTIVE SUMMARY
47
32 (68%)
24 (51%)
8 (17%)
4 (9%)
11 (23%)
Average Review Time: 16.5 days
Submittals on Critical Path: 6
Overdue Submittals: 3
CRITICAL PATH ITEMS 🚨
HIGH PRIORITY – IMMEDIATE ACTION REQUIRED
| Submittal # | Description | Trade | Status | Days Overdue |
| S-008 | Curtain Wall Shop Drawings | Division 08 | NOT SUBMITTED | 12 days |
| Impact: Delays fabrication start – 8 week lead time. Installation scheduled Week 28. | ||||
| S-021 | HVAC Equipment Schedules | Division 23 | PENDING REVIEW | 8 days |
| Impact: Equipment has 12-week lead time. Installation Week 26. Review urgently needed. | ||||
| S-015 | Elevator Cab Finishes | Division 14 | REJECTED | 6 days |
| Impact: Resubmittal required. Elevator installation Week 30. Factory lead time 10 weeks. | ||||
Recommended Actions:
- S-008: Coordinate immediate submittal from glazing contractor (contact: Mike Chen, 512-555-0142)
- S-021: Request expedited architect review (submitted 18 days ago, standard review is 14 days)
- S-015: Schedule coordination meeting with architect to resolve finish conflicts before resubmittal
SUBMITTAL STATUS BY DIVISION
Division 08 – Openings
| Submittal | Description | Submitted | Status | Days in Review |
| S-003 | Door Hardware Schedule | 10/22/2025 | ✅ APPROVED | – |
| S-004 | Hollow Metal Doors & Frames | 10/25/2025 | ✅ APPROVED | – |
| S-006 | Automatic Door Operators | 11/01/2025 | 🟡 PENDING REVIEW | 9 days |
| S-007 | Storefront System Shop Drawings | 11/04/2025 | 🟡 PENDING REVIEW | 6 days |
| S-008 | Curtain Wall Shop Drawings | – | 🔴 NOT SUBMITTED | 12 days overdue |
Division Status: ⚠️ CRITICAL – S-008 overdue, delaying fabrication
Division 23 – HVAC
| Submittal | Description | Submitted | Status | Days in Review |
| S-020 | Ductwork Shop Drawings | 10/28/2025 | ✅ APPROVED | – |
| S-021 | HVAC Equipment Schedules | 10/23/2025 | 🟡 PENDING REVIEW | 18 days ⚠️ |
| S-022 | Variable Air Volume Boxes | 11/03/2025 | 🟡 PENDING REVIEW | 7 days |
| S-023 | Controls & Building Automation System | – | ⏳ NOT SUBMITTED | Due: 11/15/2025 |
Division Status: ⚠️ CRITICAL – S-021 review time exceeds standard (14 days), equipment on critical path
SUBMITTAL REVIEW PERFORMANCE
Average Review Times by Reviewer
| Reviewer | Submittals Reviewed | Avg Review Time | Longest Review |
| Architect | 12 | 15 days | 21 days |
| Structural Engineer | 2 | 10 days | 12 days |
| Mechanical Engineer | 3 | 14 days | 18 days (S-021) ⚠️ |
| Electrical Engineer | 1 | 12 days | 12 days |
| Fire Protection Engineer | 3 | 11 days | 13 days |
Project Contract Requirement: Architect/Engineer review within 14 calendar days of receipt
⚠️ Issues:
– S-021 (HVAC Equipment) has exceeded review standard by 4 days and is on critical path
– Architect reviews averaging 15 days (1 day over standard)
Recommended Action: Request review status update from Mechanical Engineer on S-021
SCHEDULE IMPACT ANALYSIS
Critical Path Submittal Risks
| Submittal | Install Week | Lead Time | Submit By | Current Status | Risk |
| S-008 (Curtain Wall) | Week 28 | 8 weeks | Week 15 | 12 days overdue | HIGH |
| S-021 (HVAC Equipment) | Week 26 | 12 weeks | Week 14 | Pending 18 days | HIGH |
| S-015 (Elevator Finishes) | Week 30 | 10 weeks | Week 16 | Rejected, resubmit | MEDIUM |
Overall Project Schedule Status: ⚠️ AT RISK
RECOMMENDED ACTIONS
Immediate (This Week):
- 🔴 CRITICAL: Contact ABC Glazing (Mike Chen) regarding S-008 curtain wall submittal (12 days overdue, critical path item)
- 🔴 CRITICAL: Follow up with Mechanical Engineer (John Park) on S-021 HVAC equipment review (18 days in review, exceeds standard)
- 🔴 CRITICAL: Coordinate with Apex Electrical (Tom Rodriguez) on S-027 emergency generator submittal (5 days overdue)
- 🟡 HIGH: Schedule coordination meeting with architect to resolve S-015 (elevator finishes) and S-024 (lighting fixtures) rejections
- 🟡 HIGH: Verify S-031 and S-032 (roofing submittals) are on track for this week’s deadlines
PROJECT SUBMITTAL LOG EXPORT
Full submittal log available for download:
- 📊 [Download Complete Submittal Log (Excel)]
- 📄 [Download Submittal Status Report (PDF)]
- 📅 [Sync to Project Management Software]
END OF SUBMITTAL STATUS DASHBOARD