Your Count and Your Date

Count
The who-provides, who-installs, who-connects questions.
Days
Bid day, mobilization, the coordination meeting — whichever clock this project is on.
—
The RFI Clock
—
—

—

The race
Median coordination RFI response 9.7 days
Days until your date —
Statistically never answered
—
at the measured 21.9% rate
Processing cost, this log
—
—
The stamp21.9 percent of RFIs are never answered at all. Silence is a position — if the question was built to convert it.

Sync drafts the RFI built for the clock — the assignment proposed, a response window set, and non-response stated as acceptance, so even silence becomes an answer you can hold. Bring the question.

Ask Sync

Medians and rates are population statistics from the Navigant Construction Forum study (2013, 1,362 projects) — your architect may be faster, and the statistics say most aren't. Processing cost is the measured figure; an undated industry range runs higher. Population statistics, not predictions for your project. Educational estimate. Nothing you enter is stored.